Syllabus of Online Battery Energy Storage System (BESS) Training

AEDEI: Syllabus of Online Battery Energy Storage System (BESS) Training

Chapter 1 - Electrical system analysis

  • Engineering Planning of storage system
  • Identification type of load pattern (Continuous, intermitted or backup)
  • Identifications of existing electrical network and system information’s
  • Study of load pattern and load type to be served by BESS
  • Calculation of on grid / off grid load.
  • Calculation existing demand and future requirement
  • System study for BESS.
  • Electrical load and energy consumption calculation

Chapter - 2 Scheme of Battery Energy Storage System

  • Solar-plus-storage system architectures
  • Advantage and disadvantage of AC Coupling
  • Advantage and disadvantage of DCC Coupling
  • Selection of AC coupling equipment’s
  • Selection of DC coupling equipment’s
  • Comparison between AC coupling and DC coupling

Chapter- 3 Battery sizing and selection

  • Type of battery and its selection (Li-ion, Ni-cd , lead acid etc.)
  • Selection of battery cell and types
  • Standardized sizes and shapes pertaining to both primary and secondary batteries
  • Selection of Key technical terms: end of life ,Depth of discharge (DOD),State of charge (SoC),Cycling rate (C-rate)
  • Study Battery critical parameters selection (voltage of cell , Specific energy, Charge (C-rate), dis-Charge (C-rate),Cycle life, current density , Thermal runaway and Applications
  • Battery series parallel connection and String size.
  • Battery mounting arrangement and installation methodology.
  • Battery backup hours

Chapter 4 - Selection & sizing of PCU and grid tied solar inverter

  • Selection & sizing of PCU and grid tied solar inverter
  • Working principle of bi-directional PCU
  • Selection & sizing AC rating of PCU.
  • Selection & sizing AC rating of grid tied solar inverter.
  • Selection critical parameter of inverter and PCU: input AC, AC output DC Input, DC output, Battery charger parameters, efficiency, protection, communication, Auxiliary power requirement
  • Energy Management System.
  • Batteries and battery management systems:

Chapter 5 - Selection & sizing of Balance of system for BESS

  • Selection sizing of inverter duty transformer
  • Sizing of BESS container & ventilation arrangement
  • Selection of ACDB , DCDB and switchgear selection
  • Selection of DC cable between DC DB to PCU
  • Selection AC Cable between ACDB to transformer
  • Cable section for PCU and Inverter
  • Type of Earthing and calculation
  • Section of string inverter or central inverter
  • Protection scheme of HT side

Chapter 6 -: Engineering drawings and Layouts

  • • Preparation of BESS single line diagram
  • Preparation of AC single line diagram
  • Preparation of DC single line diagram
  • Preparation of BESS container layout & location
  • Preparation of earthing layout
  • Preparation of cable layouts